<?xml version="1.0" encoding="UTF-8" ?>
<rss version="2.0">
<channel>


<title>aktiencheck.de - Forum - Oroperu Resources</title>
<link>http://www.aktiencheck.de</link>
<description>aktiencheck.de</description>
<language></language>
<copyright>aktiencheck.de</copyright>
<lastBuildDate>Mon, 01 Jun 2026 07:23:19 +0200</lastBuildDate>
<ttl>2</ttl>








<item>
<title>New Oroperu Res Inc. 906630</title>
<link>http://www.aktiencheck.de/forum/New_Oroperu_Res_Inc_906630-906630-t296020</link>
<guid>http://www.aktiencheck.de/forum/New_Oroperu_Res_Inc_906630-906630-t296020</guid>
<description>Jetzt aber, 
New Oroperu JV drills 89.5 m of 2.65 g/t Au


2008-03-04 05:48 ET - News Release

Mr. K. Wayne Livingstone reports

NEW OROPERU RESOURCES INC.: BARRICK DRILLS 24,462 M IN 2007 AT TRES CRUCES

New Oroperu Resources Inc. is reviewing the status of drilling on its Tres Cruces project in north-central Peru by Minera Barrick Misquichilca S.A.

In 2007, Barrick completed a 5,776-metre diamond drill program on the Tres Cruces project, which was reported by the company in its Aug. 8, 2007, news issued in Stockwatch. Following the diamond drilling Barrick initiated reverse-circulation drilling for the purpose of in-fill drilling and testing the limits of the existing mineralization, as well as some condemnation drilling. In addition, a program of geotechnical drilling was completed comprising 3,925 metres in 20 holes.

The Tres Cruces project is a 100-per-cent company owned project subject to a 1-1/2 per cent net smelter return royalty and subject to an option agreeme [&lt;a href=&#034;http://www.aktiencheck.de/forum/New_Oroperu_Res_Inc_906630-906630-t296020&#034;&gt;mehr&lt;/a&gt;]</description>
</item>

</channel>
</rss>







